Bill of Quantities vs Building Estimate
Bill of Quantities vs Building Estimate
If you are planning a build, renovation, extension, or commercial fit-out, you will almost always hear two terms early on: Bill of Quantities (BOQ) and building estimate.
They are related but not the same.
Choosing the right document at the right stage can mean the difference between a controlled budget and a project that drifts due to scope creep, an unclear scope, or pricing surprises.
This guide explains what each document is, what it is designed to do, and how to decide which one you need for your project in Australia.
Quick answer
A Bill of Quantities lists measured quantities of materials, labour, and trade items required to build a project. A building estimate predicts the total cost using rates, allowances, and assumptions. The key difference is that a BOQ is a measurement-led document designed for tendering and procurement, whereas an estimate is a cost forecast for budgeting and early decision-making.
BOQ vs Building Estimate comparison
Feature | Bill of Quantities (BOQ) | Building Estimate |
|---|---|---|
Main purpose | Create a consistent, measured scope for pricing | Predict project cost for planning and budgeting |
Typical stage | Tender documentation and procurement | Feasibility, concept design, pre-tender budgeting |
Level of detail | High, line-by-line quantities | Medium to high, often totals by trade plus allowances |
Who prepares it | Quantity surveyor or specialist estimator | Estimator, builder, or estimating consultant |
What it outputs | Quantities and item descriptions (often with pricing columns) | Cost totals, trade summaries, and allowances |
Best for | Comparing builder pricing fairly, controlling scope | Early budget decisions, cash flow planning |
Risk control strength | Strong, reduces scope ambiguity | Good, but relies on assumptions and exclusions |
Common failure mode | Poor drawings or unclear specs lead to gaps | Under-allowing finishes, preliminaries, or site costs |
What is a Bill of Quantities
A Bill of Quantities is a structured document that itemises the work and materials required for a project using measured quantities taken from the drawings and specifications. The BOQ is not just a list. It is a measurement system that converts plans into countable, checkable quantities.
A BOQ commonly includes:
Trade sections (earthworks, concrete, framing, roofing, services, finishes)
Item descriptions that align with what is shown in the drawings and specifications
Measured quantities (m², m³, lm, number, tonnes, hours)
Units and measurement notes
Sometimes provisional quantities where information is incomplete
In practice, a BOQ establishes a consistent pricing framework. If you send the same BOQ to multiple builders, you reduce the risk that each builder is pricing a different scope. That is the core value.
Read our "What is A Bill of Quantity" guide for more information.
What a BOQ is best used for
A BOQ is most valuable when:
You are tendering to multiple builders and want a true apples-to-apples comparison
You want tighter control over inclusions and exclusions before signing a contract
The project is complex, with multiple trades and a specification-driven scope
You need a transparent basis for procurement and cost tracking

What Is A Building Estimate?
A building estimate is a cost forecast for a project. It can range from a high-level feasibility estimate to a detailed trade-based estimate. Unlike a BOQ, an estimate is not always strictly measurement-led. A quality estimate uses measured takeoffs where possible, but also includes allowances and assumptions.
A building estimate typically includes:
Trade totals (often grouped into a cost plan)
Allowances for items not fully documented (fixtures, appliances, landscaping, joinery)
Preliminaries (site establishment, supervision, temporary works, safety)
Contingency and escalation assumptions (depending on stage)
Notes for inclusions, exclusions, and assumptions
What An Estimate Is Best Used For
A building estimate is most valuable when:
You are testing feasibility before committing to detailed documentation
You need quick clarity on the budget range for design decisions
You want to plan finance and cash flow earlier
You are assessing scope options, such as single storey vs two storey, or brick vs lightweight cladding
Key differences between a BOQ and an estimate
1. Measurement-led vs assumption-led
A BOQ is fundamentally a measurement document. It is built from take-offs, counts, and quantities. An estimate is a cost forecast that may use measurements but will often include allowances when documentation is incomplete.
A simple way to think about it:
BOQ answers: "What exactly is being built, in measurable terms?â
Estimate answers: "What will this likely cost, given what we know right now?â
2. Tender fairness and scope consistency
A BOQ can significantly improve tender outcomes by providing a consistent baseline. Without a BOQ, builders may interpret drawings differently, assume different finishes, and include different allowances. Those quotes can look comparable on the surface, but they may be pricing different projects.
A BOQ reduces this variability.
3. Risk control and variation pressure
Projects blow out for predictable reasons:
allowances set too low
site works underestimated
missing scope in documentation
unclear inclusions between trades
vague specifications
A BOQ is designed to reduce scope ambiguity, a major driver of variation. A building estimate reduces budget uncertainty but can still leave scope ambiguity if it is not paired with good documentation.
4. What you can do with the document after the contract is signed
A BOQ can support procurement, cost tracking, and contract administration. It can help you understand where changes impact the measured scope. An estimate is often used early, then replaced or refined as documentation improves.

When you need a Bill of Quantities
You should strongly consider a BOQ if any of the following are true:
You are requesting multiple quotes
If you want to compare pricing properly, you need a consistent scope. Otherwise, the cheapest quote often wins because it omits items or relies on low allowances. A BOQ makes pricing comparable.
Your drawings are developed and ready for tender
A BOQ is most effective when the architectural and engineering documentation is mature. If the drawings are still evolving, the BOQ will carry more provisional quantities. That is workable, but less precise.
The project has complexity
Examples:
sloping sites
basement structures
multiple wet areas
high-end finishes
custom joinery
mixed services (ducted air, hydronic, solar, smart systems)
commercial or multi-residential builds
Complexity increases the chance of missing scope. A BOQ helps control that.
You want tighter control over variations
Variations are not always bad. Some are legitimate scope changes. The issue is uncontrolled variations caused by unclear documentation, loose allowances, or inconsistent assumptions. A BOQ reduces this risk.
When a building estimate is enough
A building estimate can be the right choice when:
You are still in feasibility or concept design
If your drawings are early, the smartest move is often a staged approach: start with a high-quality estimate, then move to a BOQ later when documentation is developed.
You need fast budget clarity to guide design
A good estimate helps answer design decisions that have a major cost impact:
floor area changes
material selection (brick, cladding, roofing)
structural strategy
window package and glazing levels
kitchen and bathroom specifications
The project is simple and low-risk
For smaller, straightforward projects with limited trades, a detailed estimate may be sufficient. The key is making sure the estimate is transparent, with clear inclusions and realistic allowances.
Who prepares each document
BOQ preparation
A BOQ is commonly prepared by:
a quantity surveyor
a specialist estimator with take-off expertise (Read our guide on "What is a Building Cost Estimator?").
The skill is not only measuring. It is interpreting the documentation correctly, understanding how items should be described for pricing, and ensuring the BOQ aligns with tender requirements.
Estimate preparation
A building estimate may be prepared by:
a builder (often as part of their quoting process)
an estimator
a cost planning consultant
The quality range is wide. Some estimates are highly disciplined and measurement-led. Others are broad allowances with minimal transparency. If you want an estimate that protects you, you need a methodology, not a guess.
How BOQs protect against cost blowouts

A BOQ reduces blowouts by improving three things: scope clarity, pricing comparability, and procurement discipline.
1. Scope clarity
A BOQ forces the project to be broken into measurable items. This exposes missing documentation early. If you cannot measure something, it is often because it is not defined properly.
2. Comparable quoting
With a BOQ, builders price the same measured items. That reduces the âhidden scopeâ problem, where one builder includes items that another leaves out.
3. Better allowance control
Estimates often fail because allowances are too low. A BOQ moves more of the project into measurable items, reducing reliance on allowances.
4. Procurement and trade packaging
A BOQ can be used to cross-check supplier quotes and subcontractor scope. It helps detect omissions before they hit the site.
Typical inclusions and exclusions
A BOQ often includes:
measured quantities by trade
descriptions aligned to drawings and specs
units and measurement basis
sometimes separate sections for preliminaries and provisional items
BOQs typically do not include:
design fees
council fees and approvals unless specified
finance costs
land costs
client-supplied items unless documented
Estimate inclusions
A building estimate often includes:
trade totals and cost plan structure
allowances for finishes and fixtures
preliminaries and margin (depending on purpose)
contingency assumptions (depending on stage)
Estimates can vary widely. The key is that the estimate must be transparent about:
inclusions
exclusions
allowance values
assumptions about site, access, and services

Innovative decision framework: choose the right document in 60 seconds
Use this practical framework:
Choose a building estimate first if:
Your drawings are early
Your scope is still changing
You need a budget range to guide design
You are not ready to tender yet
Choose a BOQ next if:
You are seeking multiple quotes
You want tender pricing consistency
You want stronger variation control
Your documentation is ready for measurement
If you are doing a serious build, the best approach is staged
Feasibility estimate to set budget boundaries
Detailed estimate as documentation improves
BOQ for tender and procurement control
This staged approach is how experienced clients reduce budget risk without overpaying for detail too early.
FAQs about BOQ vs building estimates

Is a BOQ the same as a building estimate?
No. A BOQ is a measured list of quantities for pricing and tendering. A building estimate is a cost forecast that may include allowances and assumptions. A layout can appear similar, but its purpose and reliability differ.
Do I need a BOQ to build a house?
Not always. For simple projects, a detailed estimate can be enough. A BOQ is most valuable when you are tendering to multiple builders, managing a complex scope, or aiming to reduce variations and exclusions.
Who prepares a BOQ in Australia?
A BOQ is usually prepared by a quantity surveyor or a specialist estimator who performs measured take-offs from drawings and specifications. Independent BOQs are often preferred for fairness and transparency in tendering. At Estimating Australia, we specialise in construction estimating services.
Can I tender without a BOQ?
Yes, but quotes may not be comparable because each builder can assume different inclusions and allowances. This often leads to later variations, pricing disputes, or scope gaps discovered during construction.
Which document is better for avoiding cost blowouts?
A BOQ generally provides stronger cost control by reducing scope ambiguity and reliance on allowances. A high-quality estimate also helps, especially early, but it must clearly state inclusions and realistic allowances.
What if my drawings are not complete yet?
Start with a staged estimate that clearly states assumptions. As documentation becomes detailed, upgrade to a BOQ for tendering. This approach avoids paying for precision before the information exists.
How Estimating Australia can help
If you are trying to control your project budget properly, the best outcome usually comes from matching the right document to the right stage. A building cost estimate gives you clarity early. A BOQ strengthens tender pricing and reduces scope disputes later.
Estimating Australia provides professional estimating and BOQ support for residential and commercial projects. If you want a clear, practical recommendation based on your drawings and design stage, we can advise on whether you need an estimate, a BOQ, or a staged approach that protects your budget from the outset.
Offices
100% ONLINE
P: 1300 944 122
Call to arrange an online meeting.
Our Estimators are 100% Local,
With a long history of experience in
your industry, we know YOU.
Head Office / Administration
Brisbane
Postal Details
Suite 279 /
4/16-18 Redland Bay Rd
Loganholme
QLD 4129
All Enquiries
P: 1300 944 122
Sydney
Postal Details
Suite 279 / 377 Kent St
Sydney
NSW 2000
All Enquiries
P: 1300 944 122
Melbourne
Postal Details
Suite 271 /
439 Little Bourke St
Melbourne
VIC 3000
All Enquiries
P: 1300 944 122
Phone
1300 944 122